The next step in the house renovations was to bring in the fill and pour a concrete slab on top of the kitchen and bathroom floors that will pretty much make all the floors in the house level. Here are a few pictures of that process. The fill was delivered from our neighbors and friends at Hawaiian Rock. We appreciate very much that they gave us a "PIU employee discount."
The new kitchen floor base. This raises the kitchen floor about 18 inches. No more worries about taking a tumble when someone tries to go from the living room to the kitchen.
Here is the bathroom as the fill was being poured in. They poured some in and then put plastic over it before they poured the rest in.
In this picture you are looking from the bathroom into the kitchen. The kitchen already has the concrete poured. The bathroom has all the fill poured in and is waiting for the concrete.
And here is the bathroom with the concrete poured. The next step will be the fixtures and then the tiles.
Meanwhile the kids are enjoying staying at grandma and grandpa's house. Here they enjoy some swimming time in the backyard.
No comments:
Post a Comment