This week the tiling, electrical and fixtures are getting done. The work is proceeding much faster than we expected and it is looking better and better. In this picture you are looking from the dining room into the kitchen through the new pass-through window that was just cut in the wall. The guys are also working on plumbing and wiring. Here are a few more pictures of the progress being made.
The new outside door to the bathroom is hung. Mike is really enjoying having a doorway that is actually straight.
The electrical box is installed. The new box will run all the power for the kitchen and bathroom. When we put the air conditioner on the old box 5 years ago it really overloaded the system. The breakers would blow when the stove and AC were on at the same time. This should alleviate that problem.